Break Date/en: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

16 May 2023

20 January 2023

  • curprev 22:4522:45, 20 January 2023Toptiuser talk contribs 686 bytes +686 Created page with "=== Break Date === The break date is the date when the [[{{Link}}Period|period]] is closed. A closed period is no longer [[{{Link}}Aggregation|reaggregated]] every night. Usually, the break date is set to a number of days after the period has ended. The reason is that some costs regarding the period, particularly cost generated from [[{{Link}}Import|imports]], might not be available until a few days after the period has ended. When the break date has passed and the p..."