Cost Center: Difference between revisions

From Pro 9 Wiki
Jump to navigation Jump to search
(Created page with "<translate> === Cost Center === Cost centers are the [[{{Link}}Organisation Group|organization groups]] on the lowest level in the [[{{Link}}Organisation Structure|organization structure]]. By default, the lowest level of organization groups is called cost centers, but that can be changed if needed. All costs must be connected to a cost center. :* Traffic costs are always connected to an [[{{Link}}Object|object]] which belongs to a cost center, and thereby the cost...")
 
(Marked this version for translation)
 
Line 1: Line 1:
<translate>
<translate>
=== Cost Center ===  
=== Cost Center === <!--T:1-->


<!--T:2-->
Cost centers are the [[{{Link}}Organisation Group|organization groups]] on the lowest level in the [[{{Link}}Organisation Structure|organization structure]]. By default, the lowest level of organization groups is called cost centers, but that can be changed if needed.  
Cost centers are the [[{{Link}}Organisation Group|organization groups]] on the lowest level in the [[{{Link}}Organisation Structure|organization structure]]. By default, the lowest level of organization groups is called cost centers, but that can be changed if needed.  


<!--T:3-->
All costs must be connected to a cost center.  
All costs must be connected to a cost center.  


<!--T:4-->
:* Traffic costs are always connected to an [[{{Link}}Object|object]] which belongs to a cost center, and thereby the cost is connected to that cost center.  
:* Traffic costs are always connected to an [[{{Link}}Object|object]] which belongs to a cost center, and thereby the cost is connected to that cost center.  
:* Service costs are sometimes similarly connected to a cost center via an object and sometimes directly connected to a cost center.  
:* Service costs are sometimes similarly connected to a cost center via an object and sometimes directly connected to a cost center.  

Latest revision as of 09:29, 23 February 2023

Cost Center

Cost centers are the organization groups on the lowest level in the organization structure. By default, the lowest level of organization groups is called cost centers, but that can be changed if needed.

All costs must be connected to a cost center.

  • Traffic costs are always connected to an object which belongs to a cost center, and thereby the cost is connected to that cost center.
  • Service costs are sometimes similarly connected to a cost center via an object and sometimes directly connected to a cost center.