Cost Center
Jump to navigation
Jump to search
Cost Center
Cost centers are the organization groups on the lowest level in the organization structure. By default, the lowest level of organization groups is called cost centers, but that can be changed if needed.
All costs must be connected to a cost center.
- Traffic costs are always connected to an object which belongs to a cost center, and thereby the cost is connected to that cost center.
- Service costs are sometimes similarly connected to a cost center via an object and sometimes directly connected to a cost center.